- The operation of the EGHPP will contribute to the central energy system of Mongolia hence it will be independent from foreign countries.
- Egiin Goliin Hydro power plant will be the 1st high capacity hydro power plant in Mongolia.
- In 2015, total demand of electricity will exceed over supply.
- Egiin Goliin hydro power plant is one of the highly possible variation which can replace import of electricity.
- Central energy system of Mongolia imports annually $ 25 mln of electricity.
- Egiin Goliin hydro power plant will guarantee the national security of electricity.
- According to the geological study, the EGHPP geological condition of the dam foundation is found to be very agreeable.
- In November 2013, the Government of Mongolia passed resolution to start the construction of Egiin Goliin hydro power plant.
- Over the years total cost of the building power plant is increasing.
- The EGHPP is located at the confluence of Egiin and Selenge river 2.5km upstream.
- Construction of EGHPP will open opportunities of farming the water birds, fish and sable breeding.
- To fill the reservoir with water during summer and to generate electricity during winter.
- In the area of Egiin Goliin hydro power plant, annual precipitation is between 300 and 310 mm.
- In the area of Egiin Goliin hydro power plant, average temperature in December is -40 C, in July and August are +25 C.
- An ice phenomena of EGHPP, will be at its highest in December will reach 1.5m.
- In the area of Egiin Goliin hydro power plant, mean wind speed is 2.3 m/sec, humidity level is 72%.
- Since 1977, Mongolia paid $311 mln which equals to 451 bln of tugrugs on electricity imported from Russian Federation.
- Start up minutes of hydro power plant is 2-5 minutes in contrast to Thermal power plant 2-4 hours.
- Central energy system’s daily load during the winter is 776-800 MW.
- The EGHPP generated energy will be connected to the CES via 2 circuits double conductors with capacity of 220 kV.
- The main criteria for meeting the environmental objective are avoided of carbon dioxide (CO2) emissions, and the specific carbon offset of the project is determined in terms of carbon dioxide (CO2) emissions avoided per GWh over the lifetime of the project and thus EGHPP reduces 709 thousand ton of CO2 annually.
- By 2022,EGHPP is to produce 581 million kWh annually at minimum and the annual electricity generation is to vary between 581 to 2662 million kWh.
- By the April 2014 investigative study discovered 218 artifacts at the hydropower plant DAM SITE (910м), and 24 artifacts at the infrastructure route.
- 242 artifacts are planned to be excavated and preserved in 2014-2015.
- 423 species of plants grow at the Egiin Goliin DAM SITE.
- Hydropower costs less than most energy sources.
- Renewable Energy creates three-times more jobs than fossil fuels.
- In 1878 the world's first hydroelectric power scheme was developed at Cragside in Northumberland, England by William George Armstrong.
- Hydropower today provides about 20 % of the world's electricity and is the main energy source for more than 30 countries.
- Hydropower facilities can quickly go from zero power to maximum output, making them ideal for meeting sudden changes in demand for electricity.
- Hydropower can also be used for water supply, flood control, irrigation and even recreation purposes.
- The financial status of the hydroelectric industry is generally healthy due to long equipment life and low maintenance and operating costs.
- Egiin Goliin hydropower plant is estimated to cover the investment in 20-25 years of time with its sales income.
- Thermal power plants in UB city burns 3.5 million tons of raw coal, pollutes the air with 4 tons of coal, 4.5 million cubic meters of gas and 6kg emissions of sulfur gas.
- The Eg river is Mongolia's third largest river, and at the proposed dam site has a catchment area of about 40,000 km².
- Due to Mongolian country characteristics and situation, the value of 315 MW installed capacity has been selected.
- There are 21 types of fish at the Eg river.
- The new bridge that will be built across River Selenge will be a steel concrete bridge.
- Turbines and generators are expected to be replaced after 32 years of operation.
- Peak demand of the Mongolian energy system reached 948 MW, exceeding both installed and feasible generation capacity and the reason for increased imports of electricity
- Electricity is imported from Russia to the Central Region Integrated System via Selendum sub-station Russia and Darkhan sub-station Mongolia.
-
TAISHIR AND DURGUN HYDRO POQWER PLANTS ARE CONTRIBUTING SIGNIFICANTLY TO DOMESTIC TOURISM
Tasihir and Durgun hydro power plants are supplying power to the western energy system and saving millions of dollar, at the same time contributing significantly to domestic tourism. Source: Tsagiin Khurd news aired on August 22, 2015.
Date: 2015-08-26 :: Read more -
EGIIN GOLIIN HPP PROJECT’S CONSULTANT B.OCHIRJAV
Egiin Goliin HPP project’s consultant B.Ochirjav’s interview from the project site in February, 2014.
Date: 2015-06-22 :: Read more -
PROJECT’S STEERING COMMITTEE MEETING WAS HELD
Project’s Steering Committee meeting was held on 5-th of June, 2015 in UB.
Date: 2015-06-05 :: Read more -
ARCHEOLOGICAL TEAMS NOW ON DUTY
The Government of Mongolia resolved to build Egiin Goliin HPP. Before the construction begins, environmental, archeological, and fish studies have been carried out.
Date: 2015-06-03 :: Read more -
INFRASTRUCTURE WORK OF THE EGHPP IS TO START
The government regular session was held in May 25th, 2015 and the following issues were resolved.
Date: 2015-05-26 :: Read more -
RENEWABLE ENERGY MEETING
Mongolian enormous reserves of renewable energy in Asia but also the world's attention.
Date: 2015-05-22 :: Read more -
PARLIAMENT MEMBERS WORKED AT THE PROJECT UNIT
People visiting the project unit is truly a diverse crowd that includes ordinary citizens as well as state officials, all interested in the project.
Date: 2015-05-21 :: Read more -
PARTICIPATED IN TELEVISION INTERVIEW
Development of EGHPP has been a hot topic among Mongolian media outlets for many years
Date: 2015-05-14 :: Read more -
CONTRIBUTED TO THE NATIONAL TREE PLANTING DAY
According to the Presidential Decree, the National Tree Planting Day in Mongolia is organized on the second Saturday of May and October respectively, of each year. EGHPP project unit has been planting trees since its establishment to support this deed.
Date: 2015-05-09 :: Read more -
CHINA'S STRUGGLE FOR WATER SECURITY
Way back in 1999, before he became China's prime Minister, Wen Jiabao warned that water scarcity posed one of the greatest threats to the "survival of the nation".
Date: 2015-04-23 :: Read more -
MONGOLIANS ARE CAPABLE! THEY ARE OUTSTEPPING US
An interview with scientist ecologist, public figure, Natalia Tumureva, and her unique views.
Date: 2015-04-15 :: Read more -
WORLD WATER DAY HIGHLIGHTS
Mongolia is to celebrate World Water day under the slogan “Water for Sustainable Development” on 22nd, May.
Date: 2015-03-20 :: Read more -
EGIIN GOLIIN HYDROPOWER PLANT PROJECT FINANCING IS RESOLVED
The government decided to finance the EGHPP project with soft loan from People’s Republic of China, and resolved to proceed with further discussion.
Date: 2015-03-10 :: Read more -
KHUREELEN PROJECT TO COOPERATE
Khureelen project group, well known for its movies and TV series showing Mongolian beautiful nature and wild animals, has signed Memorandum of Agreement with EGHPP team.
Date: 2015-03-04 :: Read more -
MEMORANDUM WAS SIGNED
EGHPP project unit has been updating the local residents with the work progress along the way. Moreover, the project unit is working closely with administrative organizations...
Date: 2015-02-06 :: Read more -
PARLIANMENT MEMBER WAS INTRODUCED WITH PROJECT PROGRESS
The ministries have approved EGHPP project’s feasibility study and environmental impact assessment. Currently the team is working on raising funds to finance the project.
Date: 2015-02-03 :: Read more -
MEGA PROJECT CONFERENCE WAS HELD
We are living in a world where implemented mega projects mirror the development of a country, a region, the world.
Date: 2015-01-30 :: Read more -
THREE GORGES DAM BROKE THE WORLD RECORD FOR POWER PRODUCTION
Three Gorges Dam power station generated 98.8 billion kilowatt-hours of electricity in 2014, breaking the world record for annual hydroelectric power production.
Date: 2015-01-05 :: Read more -
HEADS OF ORGANIZATIONS VISITED THE PROJECT UNIT
Chairman of the National Statistical office of Mongolia Mr. S.Mendsaikhan, Chairman of the General Election Commission Mr. Ch.Sodnomtseren, Chair of the Financial Regulatory Commmission Mr. D.Bayarsaikhan, ...
Date: 2014-03-31 :: Read more -
THE FIRST MEETING OF THE WORKING GROUP WAS HELD
The first meeting of the working group responsible for Khantai team’s relocation, environmental issues and land regulation was held.
Date: 2014-03-27 :: Read more -
VISITED THE EGHPP PROJECT UNIT
The National Dispatching Center’s deputy director and the general dispatcher G.Baljinnyam’s etc., officials visited the project unit for an official meeting.
Date: 2014-03-21 :: Read more -
VISIT TO THE THERMAL POWER PLANT #4
Thermal power plant station #4 provides our main energy consumption. EGHPP unit visited the thermal power plant station #4.
Date: 2014-03-20 :: Read more -
THE PROJECT STEERING COMMITTEE MEETING WAS HELD
Steering committee meeting of Egiin Goliin Hydro Power Plant project unit has been held.
Date: 2014-03-19 :: Read more -
EXPRESSED INTEREST OF COOPERATION IN RENEWABLE ENERGY SECTOR
The State Secretary of Ministry of Energy D.Delgertsogt, received representatives of Czech Republic headed by the member of senate of Czech Republic and vice director of European Union Mr.
Date: 2014-03-14 :: Read more -
THE GOVERNOR DEMANDED FOR THE ANCIENT ARTIFACT
The governor of Hutag-Undur soum, Bulgan province D.Jargalsaikhan ia a very clamorous person. After a long field search on the territory, ancient warrior's 2 bronze helmets were found, which he witnessed with his own eyes.
Date: 2014-03-13 :: Read more -
WORKED IN BULGAN AIMAG
A working group led by the Director of the Egiin Goliin hydro power plant project unit D.Okhuu worked in Bulgan aimag.
Date: 2014-03-07 :: Read more -
WORK MEETING HAS BEEN HELD
Related officials of Ministry of Energy, Ministry of Economic Development and Development Bank of Mongolia have paid visit to Egiin Goliin Hydro Power Plant project unit.
Date: 2014-02-28 :: Read more -
WORKED AT EGIIN RIVER
Hydrologic, environmental, meteorological and other related field researches are being undertaken and ongoing at the project site, due to the development of the first large scale hydropower plant.
Date: 2014-02-23 :: Read more -
CAUGHT THE ATTENTION OF UNIVERSITY STUDENTS
Egiin Goliin Hydro Power plant project caught the attention of students and professors of Mongolian Science and Technology University.
Date: 2014-02-14 :: Read more -
MEETING WITH ARCHAEOLOGICAL SCIENTISTS
Scientist and Secretary of the Institute of Archaeology of the Academy of Sciences of Mongolia N.Gunchigsuren and archaeological scientists held a meeting at Egiin Goliin Hydro Power Plant project unit .
Date: 2014-02-07 :: Read more -
PROJECT UNIT’S LOGO DESIGN CONTEST ANNOUNCEMENT
In association with the establishment of EGHPP project unit, logo design contest was announced among the university students.
Date: 2013-12-10 :: Read more -
WORKED IN KHUTAG-UNDUR SOUM
Upon the request of the Khutag-Undur soum’s representatives, the project unit visited and held a conference on the the project and progress of the work to be done in rural area.
Date: 2013-12-16 :: Read more -
WORKED IN RURAL AREAS
The EGHPP project unit appointed a working group to determine exact route and location of road and transmission lines from Erdenet city to the project site.
Date: 2014-01-15 :: Read more -
FIRST MEETING WAS HELD WITH MONGOLIAN “TAIMEN CONSERVATION FUND"
The Mongolian “Taimen Conservation Fund” is a professional research organization experienced in conducting survey and breeding in Eg-Uur watershed aquatic fauna since 2003.
Date: 2013-12-19 :: Read more -
CHAIRMAN OF THE STATE GREAT HURAL Z.ENKHBOLD VISITED PROJECT UNIT
The Minister of Energy M.Sonompil, Minister of Economic Development N.Batbayar and the Tavan Tolgoi power plant project unit Director M.Enkhsaikhan were present during this meeting.
Date: 2013-12-18 :: Read more
DAM SITE
-
THE DAM SITE IS LOCATED
2.5 KM FROM THE CONFLUENCE OF THE EG-SELENGE river in KHUTAG-UNDUR SOUM, BULGAN PROVINCE.
RESERVOIR
-
NORMAL WATER LEVEL
910 M A.S.L -
VOLUME AT NORMAL WATER LEVEL
5.7 BILLION m3 -
SURFACE AREA
154.3 KM2
DAM
-
DAM CREST LEVEL
912 M A.S.L -
DAM CREST WIDTH
8 м -
DAM CREST LENGTH
740 M -
DAM HEIGHT ABOVE NATURAL GROUND
82 м -
DAM VOLUME
2.29 MILLION m3
POWER HOUSE
-
INSTALLED CAPACITY
315 МW -
ANNUAL ELECTRICITY PRODUCTION
606 MILLION KWh -
TURBINE
FRANCIS 4 X 68.78 MW, 2 X 20.5 MW, 1 X 3 MW
PROJECT INFRASTRUCTURE
-
FROM THE DAM SITE TO THE ERDENET SUBSTATION
72.3 KM DOUBLE CIRCUIT 220KV TRANSMISSION LINE -
FROM THE DAM SITE TO THE ERDENET CITY
71.9 KM ACCESS ROAD, 320 M LONG REINFORCED CONCRETE BRIDGE OVER THE SELENGE RIVER