About project

  • NR.
  • HISTORICAL PAGE AND TIMELINE

UPDATED FEASIBILITY STUDY

ENVIRONMENTAL, HISTORICAL AND CULTURALY STUDIES

DAM SITE
  • THE DAM SITE IS LOCATED
    2.5 KM FROM THE CONFLUENCE OF THE EG-SELENGE river in KHUTAG-UNDUR SOUM, BULGAN PROVINCE.
RESERVOIR
  • NORMAL WATER LEVEL
    910 M A.S.L
  • VOLUME AT NORMAL WATER LEVEL
    5.7 BILLION m3
  • SURFACE AREA
    154.3 KM2
DAM
  • DAM CREST LEVEL
    912 M A.S.L
  • DAM CREST WIDTH
    8 м
  • DAM CREST LENGTH
    740 M
  • DAM HEIGHT ABOVE NATURAL GROUND
    82 м
  • DAM VOLUME
    2.29 MILLION m3
POWER HOUSE
  • INSTALLED CAPACITY
    315 МW
  • ANNUAL ELECTRICITY PRODUCTION
    606 MILLION KWh
  • TURBINE
    FRANCIS 4 X 68.78 MW, 2 X 20.5 MW, 1 X 3 MW
PROJECT INFRASTRUCTURE
  • FROM THE DAM SITE TO THE ERDENET SUBSTATION
    72.3 KM DOUBLE CIRCUIT 220KV TRANSMISSION LINE
  • FROM THE DAM SITE TO THE ERDENET CITY
    71.9 KM ACCESS ROAD, 320 M LONG REINFORCED CONCRETE BRIDGE OVER THE SELENGE RIVER
Scroll up